A Parker Hannifin motor did the work of 11 parts. Use that example to help managers ask better appraisal questions, verify the benefit and share credit fairly.

To measure employee impact, ask who benefited from the work, what changed for them and what evidence they can show. My Parker Hannifin video explains why counting hours can hide someone’s best contribution. In a 2018 IET and Feedback Consulting survey in India, 65% of midsize companies surveyed preferred soft skills training for new hires.
TL;DRIn the Hindi video, I describe how Parker Hannifin applied a cost-plus rule across roughly eight lakh products. Think about the engineer who finds a cheaper way to make a component. If its price follows its cost down, the price tells you very little about what the engineer made possible. A manager can make the same mistake at appraisal time. An analyst who used to spend a morning preparing a report now has it ready by tea. Fewer hours on the timesheet might be the first sign of excellent work.
When a customer questioned the price of a Parker motor, the team explained that it did the job of 11 parts in the customer’s machine. That changes the question a buyer asks about the motor. The line I use in the video is “कीमत लगती है सामने वाले के फायदे से।” In English, judge the value by the benefit to the person receiving it. At review time I’d ask the analyst, “Who uses your report, and what can they now do before the shift begins?”
Give managers three questions to take into the conversation. Who was waiting for this work? What did you change for them? Where can we see the difference? Let the employee choose the example, then let the manager check that they’ve understood it. “I prepare the dispatch report” describes a duty. “Dispatch can now see missing release notes before loading starts” describes a change the supervisor can check. HR can share the self-appraisal writing guide with staff preparing their side of the same conversation.
In my video I give the example of a task going from two hours to ten minutes. That’s 110 minutes released each time the task runs under comparable conditions. Ask to see a completed example from before and after. Did another person take on the missing checks? Did the next shift still receive an accurate report? Record the time per run and check how often the team actually uses the change. Finance can estimate a cash saving separately if there’s evidence that spending fell.
| What the employee says | What to ask next | Evidence to record |
|---|---|---|
| I shortened the report run. | Does it cover the same checks? | Comparable old and new runs, with exceptions checked |
| I caught an obsolete drawing. | Which job received the correction? | Revision record and corrected job instruction |
| Our handover improved. | Who designed, tested and adopted the change? | Each person’s action and the receiving shift’s account |
| I kept the routine running. | What standard did you sustain? | Expected checks, completed records and examples of follow-up |
A quiet shift can be the result of careful work. Consider a colleague who notices that an old drawing is still in the production folder and withdraws it before the job starts. The drawing register and the replacement instruction show what happened. Write down who spotted the mismatch, who verified the revision and which job received the correct drawing. You can recognise that judgement without estimating the cost of an accident or guessing how many pieces would have been rejected. Give routine checks their own space in the review.
Suppose the analyst designed the faster report, a colleague tested the exceptions and the shift lead persuaded both shifts to use it. Put the team result on the review sheet once. In each person’s record, describe the particular work they did and the evidence for it. I like to ask, “Who else would I need to thank if I told this story at the next team meeting?” It often brings out the contribution of the colleague who tested the awkward cases after everyone else thought the job was done.
For an HR-led rehearsal, give two managers the same anonymised appraisal note. Ask each to underline an observed result, circle an assumption and write the next question they’d ask the employee. Compare the two versions aloud. If the managers disagree, have them identify the evidence that would settle it. Teams can practise this conversation within a leadership development programme. To plan a session before your review cycle, send an enquiry with the roles of the reviewers and one example they find hard to assess.
TEDx speaker. 11+ yrs training Army, BRO, RBI, BARC, JSW. Available for keynotes, leadership training, team building & manager development at your office or event venue.
✅ Thanks! Avinash team will reach out within 24 hours.'}).catch(function(e){f.outerHTML='Something went wrong. WhatsApp +91 8793630001
'});return false;">Select ServiceKeynote / Motivational SpeakingLeadership Development TrainingTeam Building WorkshopManager DevelopmentEmployee TrainingOutbound TrainingBook Avinash Now →Or WhatsApp directly: +91 87936 30001
Avinash Chate TEDx Speaker · Founder, The Future Corporate · 11+ yrs experience Avinash has trained Indian Army, BRO, RBI, BARC, JSW Steel and 1000+ corporate leaders across India. His work focuses on leadership development, communication skills, and behavioural training rooted in Indian values and modern business needs. |
A verified benefit can be a clearer handover, a corrected instruction or a decision that someone could take earlier. Ask the recipient to describe the difference. Record the evidence in the language the team uses for its work.
Start with the responsibilities, resources and opportunity attached to each role. Ask the same evidence questions across roles, then judge each contribution against the expectations for that job. A colleague maintaining a reliable process deserves room to explain that work.
Record what you can verify today and label the size of the improvement as unknown. Agree on a simple observation for the next comparable run. A manager can acknowledge the person’s judgement while the team builds better evidence.
Bring an anonymised review note, the role expectations and an example where two managers interpret the same achievement differently. Remove names, pay details and sensitive business figures. To arrange a session with me, write to connect@avinashchate.com.
Corporate Trainer in Maharashtra · Top Corporate Trainers in Maharashtra · Leadership Trainer in Maharashtra · Top Leadership Trainers in Maharashtra · Team Building Trainer in Maharashtra · Top Team Building Trainers in Maharashtra · Motivational Speaker in Maharashtra · Top Motivational Speakers in Maharashtra · All service locations
← Back to all articles · Book Avinash Chate
By Avinash Chate — Maharashtra’s #1 Corporate Trainer & Motivational Speaker. .